Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
 > Literature
 Newsletters
 Brochures
 Press Releases
 O&M Manuals
John has worked on my projects as a boiler specialist. We have hired John and Lipten two times, and are in the process of developing a third project.

Both times John has provide valuable advice and service to help us to convert boilers from coal to natural gas, to engineer a new economizer for an existing boiler, and to help us develop a plan for a boiler at the end of it's lifecycle.

John's attention to detail, and timely advice has made Lipten our supplier of choice for boiler systems. John has provided complete lifecycle support from capital planning to execution of replacement systems.

—Project Manager, General Motors

  MEDIA

News, quotes and Lipten at work
Article from the July, 2004 issue of Engineered Systems Magazine
Centrifugal chiller ties to hospital’s ‘better, sooner’ philosophy
With Jim Spencer, Lipten Company General Manager
 
A highly successful health care operation cannot only have an outstanding bottom line, but it must make long-term investments in quality and innovative HVAC upgrades at the same time. Oakwood Healthcare System in Dearborn, MI, offers an example of this statement.


The full text of this article can be found on the ES magazine website via this link:

http://www.esmagazine.com/CDA/ArticleInformation/Case_Item/0,2534,127811,00.html


back to media contributions