Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
 > Projects
 Industrial
 Coal to Gas Conversions
 Ethanol
 Renewables
 Retrofit
 Medical
 Automotive
 Food Processing
"We were looking to upgrade our boilers and Lipten fit it in our powerhouse and made it compatible with our existing system. It’s efficient as heck and we get better steam with less gas and water usage."

—Joseph Serra, Providence Hospital Manager of Operations, As Quoted in The Detroit News

  MEDICAL

Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,ChillersBoiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
Project: Hamburg Center State Hospital Powerhouse Controls
Client: Commonwealth of Pennsylvania, Dept. of General Services and Commonwealth of Pennsylvania - Hamburg, PA
Scope: Three boiler control packages to fit existing panel, plant master control system. Staged demolition of old control equipment while maintaining at least two boilers for steam service.
Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,ChillersBoiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
Project: Oakwood Healthcare Systems
Client: Crothall Asset Management Company
Scope: Demolition of steam absorption chiller system and associated cooling tower. Replaced with 650-ton electrical centrifugal hi-efficiency chiller, hi-efficiency VFD controlled cooling tower, instrumentation, two chilled water circulation pumps, interface to the existing building management system for control, monitoring and report generation.
Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,ChillersBoiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
Project: Allentown State Hospital Powerhouse Renovation
Client: Commonwealth of Pennsylvania, Dept. of Public Welfare - Harrisburg, PA
Scope: One 25,000-pph package boiler-dual fuel, two 20,000-gallon fuel oil storage tanks with tank management system, fuel oil pump skid, steam management system and ancillary equipment. Demolition of coal fired boiler, FD & ID fans, stack, coal and ash handling equipment, asbestos abatement and installation of emergency rental boiler piping system.