Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
 > Projects
 Industrial
 Coal to Gas Conversions
 Ethanol
 Renewables
 Retrofit
 Medical
 Automotive
 Food Processing
John has worked on my projects as a boiler specialist. We have hired John and Lipten two times, and are in the process of developing a third project.

Both times John has provide valuable advice and service to help us to convert boilers from coal to natural gas, to engineer a new economizer for an existing boiler, and to help us develop a plan for a boiler at the end of it's lifecycle.

John's attention to detail, and timely advice has made Lipten our supplier of choice for boiler systems. John has provided complete lifecycle support from capital planning to execution of replacement systems.

—W. Bernie Yeater PMP, CEM - General Motors

  RENEWABLES

Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,ChillersBoiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
Project: Renewable Energy Facility – Cleveland, Ohio
Client: Northeast Ohio Regional Sewer District (NEORSD)
Scope: Lipten is providing engineering, procurement and startup services for an Energy Recovery System (ERS) for the Northeast Ohio Regional Sewer District. This project involves creating steam using waste heat from sludge incinerators to drive a 3MW turbine. Lipten’s equipment scope of supply includes: 3MW turbine, condensers, water softeners, reverse osmosis system, deaerator, blowdown systems, chemical feed systems, condensate receiver, desuperheaters, miscellaneous tanks and transfer pumps as well as local equipment controls and ERS supervisory controls. Lipten’s engineering scope includes: confirm equipment design and functionality is in compliance with drawings and specifications, equipment fabrication expediting, drawing redlines based on updated engineered design and finalized equipment, confirmation of controls hardware and software architecture, confirm pipe sizing and material of construction, and additional oversight of the ERS design and installation. Startup is scheduled for Summer 2013. Lipten services and equipment are critical to the success of this over $100 Million project.
Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,ChillersBoiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
Project: 24 MW Woody Biomass
Client: Private
Scope: This 24MW Co-Generation plant will use wood waste as the primary feed-stock for a 325,000 lb.per hour Field Erect solid fuel stoker type boiler operating at 850psig from Lipten. Complete EPC services will be provided by Lipten. Other equipment will include CombustionPac controls by Lipten for all the burner management controls, combustion controls and balance of plant controls, economizer, DA tank, fuel handling system, water treatment system, co-generating equipment, cooling tower and air emmissions equipment.
Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,ChillersBoiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
Project: GM Assembly
Client: General Motors
Scope: 300,000 lbs/hr CFB at 1460 psig and 955 degrees F.
Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,ChillersBoiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
Project: 36MW Woody Biomass
Client: City of Grayling
Scope: 36MW Woody Biomass Co-Generation station. 330,000 lbs/hr stoker fired boiler at 1250 psi and 950 degrees. Plant came online in 1992