| > What's New |
| Electronic Brochure |
| EPC Overview |
| CombustionPac Overview |
| Latest Project |
"The project was handled in a manner that always made you aware of your value as the customer. Jim (Lipten project manager) responded to all inquiries in a prompt and extremely professional manner. You could always sense that he was concerned about doing everything within his power to keep the project moving and the customer happy. John (Lipten site supervisor) did an outstanding job of coordinating the work in the field. He made the necessary contacts to get clarification for any questions that arose in a timely manner and was always in contact with the key players needed to keep the project moving. I’m pleased to be closing out my career with the State of Pennsylvania having had the opportunity to see a project of this magnitude completed without the ever familiar delays that typically occur within the layers of the State Government decision making process." Michael McGrath, Allentown State Hospital |
|
|
|
|
|  |  | Project: St. Mary’s College Coal to Natural gas Conversion Industry: Client: St. Mary’s College Scope: Lipten was contracted to provide full Design & Build Turn-key Coal-to-Gas Conversion, and powerhouse renovations. Lipten converted two 50,000 pph field erected coal boilers to vertically up-fired natural gas with fuel oil backup. In addition, a new 30,000 gallon fuel oil storage system, a new diesel generator backup system and a new deaerator system were installed.
Lipten’s scope also included a re-furbished triplex softener system, a new power distribution system, three new burner management & combustion control systems, a plant master system and a dual PLC based plant monitoring system. An entirely new instrumentation control valve and control device package was also included. Lipten provided engineering, project management, start-up, training and commissioning.
|
|
|
|
|