Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
 > What's New
 Electronic Brochure
 EPC Overview
 CombustionPac Overview
 Latest Project
"Lipten worked with us to install a high pressure boiler at a Ford Motor Company facility. It should be noted that the experience and knowledge of the Lipten project manager and Lipten Field Superintendant has made this a pleasurable project."

—Ray Coy, John E Green Company

 
Latest Videos

Latest Project
Boiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,ChillersBoiler, Boiler Controls, EPC, Design Build, Energy Biomass, Coal Burners, Waste Fuel,Chillers
Project: Process Dryer
Industry: Industrial
Client: Navarre, OH
Scope: Lipten completed the design, fabrication, installation and commissioning of a unique low-cost dryer concept for the Cultured Stone division of Owens Corning. Lipten combined modified insulated shipping containers with commercial HVAC furnaces and the versatile Lipten CombustionPac™ control system to create a simple yet effective drying system. The overall system allowed for forklift loading of product and tight curing temperature control.  The system was automated to ensure specific moisture content and alert when product cycle was complete.